|
Re-Assembly
|
Royal Aircraft Services | home
Re-Assembly
The aircraft and its newly painted primary flight controls are moved to our maintenance facility for:
Reinstallation of control surfaces, using the data recorded during the aircraft's disassembly
Rigging check
Operational inspections of the flight controls, flaps and lights
Inspection of gear wells, flap wells, flight control wells, static port, pitot tubes, etc.
Inspection of wheel bearings and repacking
Gear-retraction test
Check flight
|