Royal Aircraft Services | home
Base Coat Painting
As with the primer, the base coat can only be applied if the air, the paint and catalyst, and surface temperature of the aircraft is above 50° F (10 ° C) and the surface temperature is at least 5 ° F (3 ° C) above the dew point.
It is essential that no more than 72 hours elapse between the application of the primer and the base coat.
The bond between the primer and the base coat depends upon a chemical reaction between the two products. After 72 hours the primer becomes chemically inactive and this bond will not occur.
Without the chemical adhesion between the primer and base coat, over time the paint will begin to flake off the leading edges and other surfaces that are exposed to abrasive action.
|